GKY & Associates

Water Resources Solutions

River Basin Planning

GKY understands that river basin plans must often satisfy conflicting objectives – for example, low reservoir water storage is ideal for flood control, while high storage is preferable for ensuring water supply. We develop models that quantify the trade-offs between competing priorities and develop operating rules that allow clients to meet varied goals.

Our experience includes:

  • » Muskingum River Basin Optimization Study for the Huntington District of the US Army Corps of Engineers. GKY developed a river basin simulation model to illustrate the complex interactions between various reservoir functions (flood control, water supply, recreation, minimum instream flow, etc.) and recommended system-wide operating rules.
  •  
  • » Shepaug River Study. GKY helped solve a water resources dispute by creating a detailed river basin model for the Shepaug River and portions of the Naugatuck River, recommending system-wide reservoir operating rules, and serving as an expert witness during trial.
  •  

 

GKY & Associates - Civil Engineering